Resolved [14/04/2022 11:03]
Identified [29/03/2022 14:51]
There is currently an issue impacting the power to the LD8 data centre. This is not service affecting, and is for information purposes only at this stage. Their power is currently using backup generators.
<-- snip -->
Equinix IBX Site Staff reports that the fault occurred on a high voltage underground electricity cable in the local area. IBX Engineers are monitoring whilst works continue via vendor to rectify the issue. Generators are supporting the site and the ongoing investigation continues.
* Situation Status: Under Investigation
* Equipment/Condition: Power disturbance
* Current System Redundancy: Normal
* Resources on Site/Pending: Vendor Contacted
* Generator Fuel Run Time (hrs.): 417.1 hours
* Current Colo Temperature Status: TBD
* Current Colo Humidity RH Status: TBD